ES EN
Deals
✅ Trusted source Software Update

WattEV puts its first Tesla Semis into service at the Port of Oakland

📍 Drive Tesla Canada

WattEV has put its first Tesla Semis into service at a new charging depot at the Port of Oakland. They are part of a 370-truck order that will haul freight from the Bay Area toward Sacramento, the Central Valley and Nevada. According to the company's press release, it is its eighth truck charging depot in California and the first public station of its kind in Northern California. The site can charge 25 medium and heavy trucks at once at up to 240 kW each, or up to seven at 1.2 MW. WattEV expects stops of 30 minutes or less and says energy cost per mile is already below a similar diesel rig.…

🔎 Why it matters: It is WattEV's first public truck charging depot in Northern California and its eighth in the state, with Tesla Semis from the 370-unit order operating out of the Port of Oakland.
📈 Upside: PG&E's Flex Connect program lets the depot connect using existing grid capacity instead of waiting years for network expansion.
📉 Risk: Not applicable.
Read the original source →

🤖 Editorial summary of the cited source, with AI-assisted analysis -- not HgYperDrive original reporting. The original source is linked above for verification. More on how this works: editorial policy →