Powerwall Scratch and Dent: CenterPoint approves application on first try
Unconfirmed: A Reddit user following the installation of a Scratch and Dent Powerwall reports that CenterPoint approved their interconnection application on the first attempt. According to the post, they have already ordered the necessary breakers and disconnect and are in talks with a couple of electricians who would make the connections. The remaining to-do items they list are receiving the rest of the equipment, verifying that the breakers fit (they are using a dual 30A 240V breaker), choosing an electrician, and installing the equipment.…
- According to the user, CenterPoint approved the interconnection on the first attempt.
- Pending: verify that a dual 30A 240V breaker fits.
🤖 Editorial summary of the cited source, with AI-assisted analysis -- not HgYperDrive original reporting. The original source is linked above for verification. More on how this works: editorial policy →