Tesla signs long-term deal to buy solar and battery power in Arizona
Tesla has signed a long-term agreement to purchase electricity from Project Sterling, a solar and battery storage facility in Arizona developed by ContourGlobal. The deal covers 90% of the plant’s expected output, which will feature 509 MW of solar generation and a 360 MW battery system capable of delivering power for nearly four hours. The project is expected to start operations in 2028 and generate about one terawatt-hour annually, with Tesla buying the majority. This deal is unusual for Tesla, which has historically relied on local utilities for its power needs.
- Agreement covers 90% of Project Sterling output
- Project includes 509 MW solar and 360 MW battery
- Operations expected to begin in 2028
🤖 Editorial summary of the cited source, with AI-assisted analysis -- not HgYperDrive original reporting. The original source is linked above for verification. More on how this works: editorial policy →